Share This

Showing posts with label Penang Forum. Show all posts
Showing posts with label Penang Forum. Show all posts

Sunday 22 October 2017

Penang landslide tragedy, plea went unheeded, no one listened !


https://youtu.be/QB45Q2_mOG0
Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active stone quarry about 500m directly behind the site of the landslide.
https://youtu.be/yqtdkBsipCU

GEORGE TOWN: As the landslide tragedy takes its toll with three workers killed and 11 others feared dead, DAP state assemblyman Teh Yee Cheu said there are still 10 other development projects pending, but his plea to save the hills has been constantly ignored.

Some of the projects will be near hillsides and more are planned along the coastline. A few are projected to be 50 to 60 storeys high, said the Tanjung Bungah assemblyman.

“I objected to each one. I always use the words Saya membantah sekeras-kerasnya (I strongly object) and some city councillors laughed at me and said the approval authority ‘menyokong sepenuh-penuhya’ (fully supports).

“Now see what has happened,” Teh told The Star.

He was referring to the one-stop centre at the Penang Island City Council (MBPP), which is in charge of approving property development plans on the island.

Teh, who rushed to the scene of the landslide shortly after it happened at about 8.30am yesterday, did not hide his discontent over the spurt of development projects in his constituency.

“Not all those development applications have been approved yet.

“But after the general election, I expect a mushrooming of approvals,” he added.

Tanjung Bungah is one of the few residential areas on the island with a low population density.

The Lembah Permai area, locally called Hillside or Vale of Tempe, is a coveted location for its semi-detached, terraced and bungalow homes.

But in recent years, developers have been submitting plans for high-rises that rival even the height of Komtar, in the area’s unoccupied hills and seaside.

Yesterday’s landslide happened at a construction site near Lorong Lembah Permai 3.

Tens of thousands of tonnes of laterite earth slipped down from a height of about 35m, burying the workers.

Firemen told reporters that the search operation had to be carried out slowly because the slope was unstable.

Teh said he objected to the project’s planning permission about two years ago because the original hill slope had a steepness of 30 to 40 degrees.

“I apologise to my voters in Tanjung Bungah. I objected to the construction, but my words were only taken as a personal view by the MBPP and state government.

“I also apologise to the family members of the victims buried by the landslide,” he said.

Asked about a stone quarry located some 500m further uphill from where the landslide occurred, Teh said that it was active, with rock blasting going on two to three times a week.

“I am against that too, but it was allowed to continue,” he added.

Source: The Star

Another call to stop all hill-slope development immediately



Why must it take a tragedy to happen in Penang before the Penang state and local governments wake up to the dangers of rampant and unsustainable development especially on hill slopes? Or will they wake up?

Two years ago, in December 2015, the Penang Forum, alarmed by such negative developments, organised a half-day event titled “Save Our Hills” in which engineering, planning and legal experts gave presentations on the dangers of hill-slope development. (The presentations are available on Penang Forum’s website.)

It then called on the government to review and stop further hill-slope projects. Very sadly, the call fell on deaf ears and the consequences are painfully evident today after an estimate of perhaps 15 lives are lost in a landslide at a hill-slope project in Tanjung Bungah.

Penang Forum then started Penang Hills Watch (PHW), a citizens’ initiative to provide the state government, information on hill cuttings that it collects from the public. In January 2017, the PHW met with the state government; the present site where this tragedy happened was the first case that PHW highlighted to the state government. (Please visit the PHW website.) Photos of construction and hill cutting on this site were presented to the state government – to which it responded that the “earthwork is being monitored.”

The chief minister of Penang, in the Safety Guidelines for Hillside Development, said: “Penang Local Governments (MPPP and MPSP) are to strengthen their Geotechnical unit, which processes and approves applications for hill site developments, followed by strict enforcement. A monitoring team will be established to ensure compliance in construction and monitoring performance of slopes.”

The question is what happened then? Did the state and local governments follow through their own guidelines? Or was there gross negligence?

Such senseless tragedy could have been avoided. Penang Forum calls for an independent Royal Commission of Inquiry to investigate what went wrong and how such incidents can be avoided in the future. All parties beginning from the State Planning Committee that gave approval for all hill-slope projects, to the One-Stop-Committee of the Penang Island City Council that also approved the project, to the engineers who are supposed to monitor the projects, to the developers and contractors who carried out the project should be investigated and held responsible.

In the meantime, Penang Forum once again calls on the authorities to:

  • stop all hill-slope projects with immediate effect;
  • immediately amend the 2009 guidelines on ‘special projects’ to explicitly prohibit all development on hill lands, except if it is for essential public services;
  • rehabilitate all existing exposed and barren slopes and spaces to prevent further soil erosion;
  • undertake stern enforcement, effective and deterrent punishment on those who clear land illegally or do not abide by conditions imposed to prevent soil-erosion;
  • monitor frequently and effectively all hill slopes by the local authorities;
  • publicly declare and give warning on all hill slopes and areas that are not safe.

Sources: Penang Forum 
Sahabat Alam Malaysia
Consumers Association of Penang 
Residents associations and management committees of Penang

Related Links:

www.thestar.com.my/.../tanjung-bungah-landslide-penang-forum-highlighted-cases/
GEORGE TOWN: Landslides at hill slope projects in Tanjung Bungah have been highlighted to the state government since early this year, ..

Will fatal landslide spur state to protect hills?
Groups call for RCI to investigate tragedy
Missing supervisor transferred recently
DOSH and construction board to probe cause of landslide
Three bodies pulled out, 11 workers still buried in rubble

 

Consumers & Residents tell state govt, ‘We told you so’



https://youtu.be/znzduuH8Soc

GEORGE TOWN: The Tanjung Bungah Residents’ Association (TBRA) is demanding for a Royal Commission of Inquiry (RCI) on all hill slope developments in Penang, following a landslide at a construction site this morning that buried nearly 18 people.

TBRA chair Meenakshi Raman said the RCI would be a form of audit on all risky hill slope projects in the state, to prevent any tragedies from happening again.

She also said the TBRA had repeatedly appealed to the Penang government to put an end to hill slope developments as it would have a domino effect on flash floods in the state.

“We were called ‘irrational’ by the Penang government when we appealed for hill slope developments to stop. Who’s irrational now?

“Today’s incident is a grave and grim warning to the authorities to take heed of Mother Nature’s warning,” Meenakshi said when contacted today.

In the 8.50am incident, a 10m-high hill slope came crashing down next to a construction site not far from the Tunku Abdul Rahman College in Tanjung Bungah.

At the time of writing, two survivors were rescued, while two more bodies were retrieved from the mud and rubble. Although their identities are not yet known, they are believed to be foreign workers.

Meenakshi said during last month’s flash floods, TBRA and other residents’ associations made a collective appeal to the state government to end all excess developments and hill clearing in the state.

TBRA, concerned groups, and Sahabat Alam Malaysia (SAM) had also previously called on the Penang government to amend existing guidelines concerning hill slopes.

Meanwhile, SAM president S M Mohamed Idris said the NGO had written to the Penang government “several times” urging them to stop hillside developments.

“We have warned that hill slopes are fragile ecosystems and cannot be touched.

“And now, we are really shocked that the lives of many have been sacrificed. We support TBRA’s call for an urgent RCI,” he said when contacted.

Source: Free Malaysia Today

Related 

Sixth body pulled out from Penang landslide heap



Related posts:

Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood is...

Monday 4 September 2017

Drainage and construction damaged nearby houses since 2014 must complete its mitigation quickly!

Underground Pipe Culverts from IJM Trehaus site on the left and nearby pond on the right

Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project. 
Approximate Coordinates : 5°20'38.47"N,100°16'52.82"E
Reported  in August 2016. Photos taken in November 2016 and 2014 by Penang Forum
PHW Report 




https://hillclearinginpenang.ushahidi.io/views/map

Sources: Penang Hills Watch (PHW) | Penang Forum

Hill clearing activity by IJM Trehaus Project


Clearing and construction for a condo and semi-detached housing project, Trehaus, reported in http://anilnetto.com/ 26 Aug 2016. Photo taken in 2014 ...

IJM sign-boards
Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.

Underground Pipe Culverts from IJM Trehaus site on the left and nearby pond on the right

  Two invalid pipe culverts formed sinkholes at BJ Cove houses

Originally, there were two natural rivers/streams from the IJM Trehaus site and a nearby pond. No proper drainage system was implemented when housing development started, only two invalid hidden underground pipe culverts were built to channel the waters from the Bukit Jambul hill to Relau district.

The invalid underground pipe culvert from the IJM Trehaus project directly converged at BJ Cove houses from another invalid underground  pipe culvert from a nearby pond were burst, caused soil erosion, house slabs collapsed, multiple wall cracks, PBA water pipe burst, floods, sinkholes (by two pipe culverts converged in red) and damaged  to  BJ Cove houses due to blockages of waters whenever rains and because of lack of drainage system there.  The sinkhole which later converted into a manhole by IJM,  is a clear sign of soil erosion under the ground.

It is a common sense that waters from the natural rivers or streams are naturally running, seeped  through underground even the surface is covered by land-filled soil or with man made culverts.

Therefore, damages to houses were caused by severe soil erosion due to water movement under the road and buildings. 

The following shows the invalid underground pipe culvert from the IJM Trehaus site behind BJ Cove houses at Lintang Bukit Jambul 1:


IJM Underground Pipe Culvert to BJ Cove houses 2018
Waters rising from the IJM Pipe Culvert behind BJ Cove houses 2018
Waters are flowing back from another pipe culvert at IJM site to BJ Cove houses 2018

IJM Underground Pipe Culvert at bottom to BJ Cove houses 2018

IJM modifying/constructing their underground pipe Culvert in 2014 to BJ Cove Houses
IJM modifying/constructing their underground pipe Culvert in 2014 to BJ Cove Houses

IJM Underground Pipe Culvert to BJ Cove Houses 

IJM Drains
IJM Drain Waters go  to the underground Culvert
IJM Underground Pipe Culvert next to BJ Cove Houses



The above and below show the bottoms of  IJM underground pipe culvert 







Waters gushing down from IJM Trehaus site to BJ Cove houses:

Waters flow from IJM Trehaus to BJ Cove houses
 

Waters gushing down from IJM Trehaus site to BJ Cove houses




Waters from IJM site stucked at behind BJ Cove houses

The nearby pond besides IJM Trehaus site:

IJM Hill cutting and hill Clearing 2014

Serious Drainage Issues


The Department of Irrigation and Drainage (DID or JPS) has just started in September 2017 constructing the drain from the pond to divert waters:

A drain under construction by JPS to divert waters from the nearby pond
Drain waters flow plan under construction by JPS to divert waters from the nearby pond

 Letter from Penang Dept of Irrigation and Drainage (DID or JPS) in 2015 blamed IJM  failure to comply with sedement control plan (ESCP) when its Trehaus started in 2014.



Clearly, the underground pipe culverts leaked and waters seeped through the ground and multiple cracks,  as it did not happen immediately but over a period of time!




Developers dishonored directives/letters issued by Penang City Council (MBPP - Majlis Perbandaran Pulau Pinang) in 2015 to rectify the damaged house






Developers have not completed their committments to rectify the damages despite  acknowledged their liability as per letters from Worldwide Venture Sdn Bhd, an subsidiary of IJM Land since 2014!


 
 


Despite the underground pipe culverts declared invalid by JPS and the Penang City Council's (Majlis Perbandaran Pulau Pinang, i.e. MBPP) issued stop work orders directing the developers, Worldwide Venture Sdn Bhd, a subsidiary of IJM Land to rectify the damages within 1 and 2 weeks time since 2015 (as per the above attached letters), the multiple wall cracks, slabs collapsed, PBA water pipes burst, leakage charges, damaging ceiling, electrical DB board, and tiles fallen, broken/popped up,  are still pending settlement and remedial works to be carried out by parties responsible for the damages since 2014 !!



IJM Land only started in December 2017 constructing new drainage to divert waters from Trehaus Site to the pond and underground pipe culverts:


Pictures show IJM only started in December 2017 constructing drainage system to divert waters to the nearby pond and underground pipe culverts


Waters are flowing back to the pond during heavy rain 2018
Waters from IJM site overflown to the pond 2018
For waters to flow out smoothly, the pond must level up with more soils, 2018


Waters in the pond gone up during heavy rain 2018 - must build a wall  to prevent waters from seeping thru houses.
Waters cannot move out smoothly due to obstructions which are being removed by a man  2018
 

It is important that the pond should be made a dried pond instead of existing wet pond on the following reasons:

i) The area was originally a natural river/stream where waters will still be naturally running, seeped through underground even when the underground culverts are to be closed/abandoned later.

 

ii) More waters were being diverted from the IJM site to their underground pipe  culvert and to BJ Cove houses.

 

iii) Now, drain waters from IJM site are being channeled back to IJM pipe culvert to BJ Cove houses at Lintang Bukit Jambul 1 where a manhole next to house no. 20 constructed by IJM is not closed despite it has been declared invalid and illegal by JPS!  This poses concerns to residents at BJ  Cove houses.

c
IJM Drain water Pipe Culvert Site to BJ Cove houses
IJM Drain water Pipe Culvert Site to BJ Cove houses
Waters stuck behind BJ Cove houses at IJM site 2018

IJM Drain  waters  gushing  down to pipe culvert

Sinkhole at house 20 is covered up by IJM's underground pipe culvert from  IJM Trehaus

 

The damaged houses are still pending, not being completely rectified to date !

Damages appeared after IJM began construction works in 2014, like hill clearing, rock-blasting, piling and digging culvert at Trehaus site.  As a result, sinkholes appeared, floods, waters seepage through multiple cracks on the ground, walls, tiles fallen from roofs and popped up from the ground due to vibration from rock-blasting and piling works.

 
Sinkhole converted to manholes (2 in cycles) at BJ Cove houses are visible from the top of IJM Trehasu site

Pictures showing floods, sinkholes at Lintang Bukit Jambul 1, 11900 Penang,  damaged to BJ Cove houses, cracks, waters leakages seeped through the cracks, slabs collapsed, ceilings & tiles broken & fallen, electrical DB board explosion, etc caused by severe soil erosion due to water movement under the road and buildings. The underground pipe leaked and waters seeped through the cracks!


A big Sinkhole near BJ Cove house no. 20

IJM converted the sinkhole into a manhole waters from their underground pipe culvert at Trehaus
These are IJM Manhole converted from Sinkhole:

Sinkhole at house 20 is covered up by IJM's underground pipe culvert from  IJM Trehaus


IJM converting the Sinkhole into Manhole next to  BJ Cove no. 20
Outside house drain and fence damaged by IJM during mitigation of Sinkhole
A big Sinkhole occurred due to invalid underground pipes culverts choked near house no. 20
Waters at the underground pipe culverts flown out from the house No. 20 to outside drain
 
Slabs collapsed due to cracks without compacted hardcore

Roof top Ceiling Board fallen due to strong vibration caused by IJM rock-blasting works 2014

Electric DB Board explored due to burst pipe waters seeped thru the wiring.



Waters leaked from the burst pipes entered into Bedrooms

 Multiple Cracks in Bedrooms 













Plumbers repaired the broken water pipes
















 

Truth Be Told:


The truths be told,  as echoed, reinforced and justified by recent events in  Penang floods on 15th Sept 2017,  Landslides in Tanjung Bungah on 21 October 2017, the storm on Nov 4 & 5 2017, floods again on Jan 5, 2018, and the Huge 'bleeding' landslide in Tg Bungah hill  on May/June 2018  in related posts,

.... see more on links to following reports:

https://youtu.be/ooyXvqmxbvw GEORGE TOWN: Some 20 houses located on a slope in Hong Seng Estate in Mount Erskine were flooded due

Hills, landslides, floods and damaged houses ...

Penang landslides & flooding are natural disasters man-made...  

Penang floods and landslides, looking beyound natural causes!

Penang landslide, whose faults?

Penang Paya Terubong Residents living under shadow of fear!

Penang landslide tragedy, why it happened?  

PAC blamed Penang Island City Council (MBPP) for failing to enforce laws on hillside development  

 

We demand immediate enforcement & Actions to complete the remedial works:

 

1. The parties responsible must quickly without further delays, without condition to settle the claims and start the remedial works to the damaged houses, as both JPS has declared underground pipe culverts invalid and  MBPP has  issued stop work orders directed the developers, Worldwide Venture Sdn Bhd, a subsidiary of IJM Land to rectify the damages within 1 and 2 weeks time since 2015!


2. Enforce IJM's & MBPP' Letters/Stop-work Orders (attached in above), and divert waters from the two invalid underground pipe culverts deemed illegal at the IJM Trehaus site and nearby ponds which must be closed and grouted as a long term solution to the problems. 

 

3. Enforce a fresh cease and desist to Stop Work of IJM Trehaus construction project until the structural damages to house at 20 Lintang Bukit Jambul 1, BJ Cove have been resolved and settled the claim for damages and distress caused by the fear and danger of living in the house, without further delays and their suffering more than four years since 2014.  Repairs and remedial works must start promptly as more damages and suffering will fellow!

 

4. Beef up the enforcement and accountability not just in government agencies but also in professional bodies, like the Board Of Engineers Malaysia (BEM),  the Institute of Engineers Malaysia (IEM), etc to uphold the professional ethics, integrity and standards, to ensure public safety of the buildings and people life.

 

5. The pond must be made a Dried pond for waters to flow out smoothly, because there was originally two natural rivers/streams in the area where waters will still be running/seeping through naturally under the ground. 

 

 6.  Now, drain waters from IJM site are being channeled back their underground pipe culvert flowing to BJ Cove houses at Lintang Bukit Jambul 1 where a manhole next to house no. 20 constructed by IJM  is not closed despite it has been declared invalid and illegal by JPS!  This is a great concern to residents at BJ  Cove houses. We want JPS and MPPP to close & grout the manhole promptly.

 

7. Damaged house owners firmly reserve all their rights to take all necessary legal steps against those responsible exclusion their liabilities.


Findings from Penang Forum 

Dr Kam, a scientist, focused on expansion of impermeable surface area (caused by ill­ planned development and replacing natural ground cover such as hills, fields and trees that act as a water ­absorbing sponge) and soil erosion and landslides (caused by cutting and development in hill areas) as two factors that need special attention.

She quoted Datuk Kam U Tee, the Penang Water Authority general manager (1973~­90), as having correctly explained the Penang floods of October 2008, as follows: the floods were caused by conversion of the Paya Terubong and Bayan Baru valleys into “concrete aprons that do not retain water. The water immediately flows into streams causing flash floods even with moderate rainfall. Because of hill­cutting activities, the flowing water causes erosion of the slopes which carries mud and silt into the river beds”. ( The Star, Oct 24, 2008).


See more  ....
 




Credits - Slides presented by Environmental, health and safety consultant Aziz Noor, and scientist Dr Kam Suan Pheng at the Penang Forum event on Oct 29, 2017

See more ....



Practise true CAT for Sustainable Development

  • Penang government must provide a COMPETENT flood mitigation plan for the state starting with a comprehensive Drainage Master Plan Study and not slogan.

  • The Penang government has to be ACCOUNTABLE to the people and not private developers. In other words, ‘Politicians should be ‘wakil rakyat’ and not ‘wakil pemaju’. If certain waterways and catchment areas have to be gazetted as permanent drainage and storage areas, then so be it. 

  • The safety and well-being of the Rakyat has to come first.  In the interest of  TRANSPARENCY, Penang has to launch an inquiry into how the local council approved property developments on slopes without adequate slope protection.

 See more ...

1. Wanted: Leaders who listen !
2. Sustainable Development in Penang
3. Call to reassess Penang hillside projects, councillor addresses full council meeting of MBPP
4. Penang landslide, whose faults?



Related:   


Include Penang Forum in panel probing Bukit Kukus landslide tragedy

 

  At Penang landslide memorial, group questions silence of PH MPs

 

 

Consultant, contractor of Bukit Kukus paired road project slapped with ...


Risky building on hillslopes - Nation


Come together to save our state 

 

In Malaysia, an island drowns in its own development

 

Watch "Slope Stability" on YouTube


https://youtu.be/2wT2he6Numk

Penang MP rapped for asking for allocation while rejecting Budget ...

KUALA LUMPUR: A Penang Opposition lawmaker was rapped for voting ... Budget 2018 yet seeking an allocation for flood mitigation projects.

RM150mil for flood mitigation projects - The Star Online


A tempest flays the north

GEORGE TOWN: When the storm hit, everyone in the north prayed it would soon blow over.Penang flood: Precautionary power cuts in place as waters rise

Penang paralysed by floods - Nation



Irked residents to hold meeting with state representatives on Penang ...



https://youtu.be/n2vO-nsZxkY

'Bleeding' landslide worries residents - Nation

Damaged houses to be repaired - Metro News

Rep: Redevelop village to solve recurring erosion - Metro News

Residents prefer affected houses to be torn down manually

Bruised in sinkhole fall at home - Nation

Penang CM must stop blaming past govt for problems

Cracks in homes force seven Penang families to flee - Nation

Here's the proof — federal govt gave only RM443mil for flood mitigation

Former councillors claim Penang government abuse caused floods

PAS claims graft caused floods in Penang | Malaysia

Penang pays high price in storm havoc - Nation

Up to the chest in water, up to the neck with the excuses - Nation

Dept: Typhoon Doksuri caused erratic weather across Penang ...

Rapid development in Penang root cause of massive flash floods ...

Admit failure in solving floods and stop giving excuses, Penang govt told

Deluge brings chaos to northern states - Metro New

Penang floods: Body of missing woman found in Bukit Jambul river

Updated) Penang flash floods claim a life, second death due to floods ...

https://www.nst.com.my/.../updated-penang-flash-floods-claim-life-second-death-due-...
Sep 16, 2017 - ... Noor Afidah Yahunas, 30, who fell from her motorcycle into a culvert in ... by rescuers in a river near Bukit Jambul about 7.45am today, nearly 24 ... to lose balance and fall off, before she was swept away by strong currents.

Boast to end floods rings hollow - Nation

Anti-flood plan in pipeline - Metro News 

Chant: Set up unit to monitor hill projects - Nation

CAP: Halt projects in flood-prone areas until wet spell ends - Nation ...

Penang mayor Maimunah quits job to accept UN post

Hiking trail in awful condition - Metro News

Clogged drains main cause of floods - Metro News

 

  Narrow drains contribute to flooding

 The narrow drainage system which Chua claims results in flooding in the area.


 



Related posts:

Cracked drain causes road cave-in, house nearby on brink of callapse


MBPP, contractor, engineers and DOSH named as responsible in fatal Penang landslide

Kudos to Deputy Chief Minister I Datuk Ahmad Zakiyuddin for holding the four parties accountable for the Bukit Kukus landslide tragedy. The inquiry still begs a lot of questions, e.g. why was the contract given to Yuta Maju from Terengganu? Could the accident have been prevented if a proper EIA was done? It is not just a "bureaucratic hurdle" but supposed to identify risks and advise mitigation. If the authorities wish to go on with the project, it is not too late to commissi...
See more


 “This is no simple incident as nine deaths resulted from it. Very stern action must be taken against the MBPP, and that includes strong disciplinary action against the mayor and officers responsible.

“Otherwise, it will be business-as-usual in the MBPP as the officers will be allowed to go scot-free with impunity.



Come together to save our state - Letters | The Star Online

 


   

Landslide nation, Malaysia ranks highly for landslides

 


A drone picture of the collapsed beams along Jalan Tun Sardon leading to Balik Pulau on the left while Jalan Paya Terubong on the ri...
Consultant gets show-cause letter for ‘overlooking hilltop stream’ GEORGE TOWN: The consultant of the Bukit Kukus Paired Road project...

Action taken over irregularities at Bukit Kukus paired road project Penang

https://youtu.be/dMF95t2gXzg

 

Malaysia’s Penang Island has undergone massive development since the 1960s, a process that continues today with plans for transit and land-...


 

Huge landslide in Tg Bungah hill


Becoming bald: A view of the clearing work seen at Bukit Relau which was visible from the Penang Bridge in November last year. GEORGE..



 Fake Awards Scam for Penang Island City Council, Seberang Perai Municipal Council ! 
Home locked by Penang City Council over RM468 paltry arrears of assessment 

Penang floods and landslides, looking beyound natural causes! Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue session themed ‘Penang Fl..

https://youtu.be/ooyXvqmxbvw GEORGE TOWN: Some 20 houses located on a slope in Hong Seng Estate in Mount Erskine were flooded due


How to measure a politician?
Use technology to learn more about them before casting your vote Cheah taking a wefie with Tanjung Bungah assemblyman Teh Yee Cheu (be...

 Wanted: Leaders who listen !
Turning a blind eye: The grumblings over exposed hills are growing louder but little is being done to rectify the situation   G...


  With the GE imminent, politicians are already snarling at each other, hoping to score points early. I love dogs. I’ve always had o...



It’s hard to deny when the effects of climate change are all around us  Andrew Sheng says that from increasingly intense hurricanes t...


Why did MBPP approve the Tanjung Bungah development project? Read more at https://www.malaysiakini.com/letters/399357#qbRd534yu1JfC551....


https://youtu.be/kslhytLg-Wc Hills, landslides and floods: What to do?   The mega floods in Penang which followed the landslide...



Choong (in white) surveying the deforested hillslope next to Majestic Heights. PENANG MCA has raised concerns about the safety of the r...


Wet, wet woes: (Above) Bukit Jambul is flooded once again after an evening downpour. Firemen installing a pump to draw floodwater...


Council should not bow to development or political pressure, says city councilor, Khoo ‘Politicians should be ‘wakil rakyat’ and n...
(From left) Dr Kam will deliver a talk on ‘Understanding the Causes of Floods and Seeking Solutions. State assemblymen expressing inter...


https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...


Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety issues ..


https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s..



Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood...


Our Environment is Our Life - YouTube THE year has barely started, and already we have so many reports of weather and climate-related e...
Sponge City: Solutions for China's Thirsty & Flooded cities  China's 'sponge city' projects may be worthwhile examp...

Getting titles right in the engineering field in Malaysia

  Getting titles right in the engineering field in Malaysia ..

RECENTLY, the Institution of Engineers Malaysia (IEM) received an enquiry on the usage of the title “Engr.” for members of the institution. The title “Ir” was first introduced by IEM in the early 1970s for both the graduate and corporate members of the Inst...Getting titles right in the engineering field in Malaysia rightwaystosuccess.blogspot.com

 2 structures collapse due to incompetent engineers and irresponsible officer of MPPP/MBPP

 

 Penang has acknowledged the Hills Clearing cases reported by Penang Forum

 

Penang Forum tells Chief Minister: the unmitigated disasters on hill projects 


Wall and awning collapsed in house near construction site







Penang Island City Council, MBPP councilor Dr Lim fed up change not happening in Penang

 

Penang Forum concerns over hill clearing and floods; the Declaration & Recommendation 

 

 Penang flood aftermath: design pump system needed to drain out water, fix funding snag ...


  Long and winding road: This satellite picture from Google Earth Pro shows five planned interchanges of the Teluk Bahang-Tanjung Bun...



Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem...


LATELY, we have been seeing many photographs and a lot of video footage of handcuffed men and women in orange T-shirts bearing the wor...




IJM and Genting excluded from investments wealth fund due to severe environmental damage
Environmental issues: IJM and Genting have interests in palm oil operations. Norwegian fund to call off investments on environmental iss...


PETALING JAYA: Some RM40mil from the Skills Development Fund Corp is believed to have been siphoned off by those tasked with utilising it.



Taiwan developer detained over deadly quake building collapse ...

The developer of a building in Taiwan that partially collapsed during an earthquake has been detained for negligent manslaughter with prosecutors saying the man was not licensed to oversee construction projects. The lower floors of the 12-storey Yun Tsui residential building which also housed a restaurant and hotel pancaked when a 6.4-magnitude quake struck the tourist hotspot of Hualien on February 6. A total of 17 people died across the eastern coastal town, 14 of them in the...

Getting titles right in the engineering field in Malaysia